The work at Woodland Camp continued to progress with the building of the 16 new cabins. After the installation of all the steel ring beams, the brothers poured concrete on ...
Read More
There was steady progress on site these two weeks.  The work has focused on the preparation of a second set of five new cabins (for a total of ten new cabins ...
Read More
Praise the Lord for His continual giving of grace upon grace. This wonderful grace is the very element that allow us to keep labouring on the site. The main focus ...
Read More
It was another wonderful week of progress at Woodland Camp. On the new cabins, the brothers continued installing concrete beams and blocks, timber sole plates, steel framing, and top plates ...
Read More
This week the Lord has blessed us with good weather and steady progression on site. The focus of this week was finishing the erection of the steel beam frames on ...
Read More
This spring, there have been three significant advances in the building project at Woodland Camp. Firstly, the prototype cabin is nearing completion both internally and externally.     In May ...
Read More
This week’s focus was the installation of the screw piles and the erection of the steel beam and block for the new cabins. The screw piles are installed up to ...
Read More
This focus of the work this week was on road works and setting out the screw piles for the new cabins. The installation and setting of the mesh and the ProtectaWeb ...
Read More
The major project this week was the road works on the north-east side of the camp. A base-layer of gravel was laid on the surface to facilitate access for the ...
Read More
This week’s focus was on the prototype cabin. Wood cladding was installed by cutting it to fit around the windows, doors, and other architectural features ...
Read More
The focus of the work this week was on the prototype cabin. An insect protective net has been installed around the cabin prior to the wood cladding being installed.  Inside ...
Read More
The focus for the week was to continue with the road works by preparing and grading the ground for placing the concrete kerbs.  Electrical cables were installed and distributed to ...
Read More
In May 2019 the decision was made to build 16 cabins, which essentially completes the east side of the camp. The prototype cabin has helped us confirm the design, and ...
Read More
The focus of the work this week was on the central plant electrical cables that are being connected to the electrical distribution houses. After insulating the electrical distribution houses on ...
Read More
The focus of the work this week was on the site. The brothers on the site insulated two of the electrical distribution houses. They also sheathed them in plywood and ...
Read More
The return of rainy weather did not deter the work this week. The brothers working on the prototype cabin have finished the concrete board in the shower and toilet rooms ...
Read More
The work this week focused on the central plant. In the central plant the brothers installed EDPM (a waterproof membrane) in the air handler room. They applied two more coats ...
Read More
The focus of the work this week was on the central plant.       Contractors came to install an 18,000 litre water tank in the central plant. The brothers ...
Read More
The work carried on at Woodland Camp this week. The brothers working on the central plant installed a second layer of battens around the building. These battens are cut at ...
Read More
The brothers hired a surveying machine and have used it to mark the underground work they have done so far. This will (1) give the planning saints an accurate picture ...
Read More
Last week, the focus of the work was the central plant. The brothers installed a waterproof membrane, insulation, and plywood sheathing throughout the interior of the central plant. They painted ...
Read More
The work continued at Woodland Camp this week. The brothers spread a waterproof membrane over the flat roof of the central plant. They also began to fasten insulation around the ...
Read More
Despite a little snow, the brothers continued to make progress at Woodland Camp this week. The walls of the central plant are now sheathed in plywood and wrapped in Tyvek ...
Read More
The work has progressed steadily at Woodland Camp this week. The brothers built and erected the walls for the central plant. On the site, the brothers completed and pressure tested ...
Read More
There was a great week of dry weather at Woodland Camp, which allowed the brothers to accomplish quite a bit of work. The brothers began installing the heating hot water ...
Read More
This week the brothers focused on site work around the property. Trenching has commenced again, and the brothers are working to bring water and gas to the eastern bank of ...
Read More
The majority of the work at Woodland Camp this week was related to the central plant. The brothers have erected 12 galvanised-steel columns and 19 pieces of horizontal bracing. The horizontal ...
Read More
Prior to July 2018 the major breakthroughs with the construction project at Woodland Camp were related to engineering projects, securing and clearing the site, and developing  a core construction team ...
Read More