29 February 2020

Posted on February 29, 2020 in Building Project, 2020 Updates

Previous Update

Woodland Camp Archives

Next Update

Woodland Camp Update
29 February 2020  

 

The Lord continues to bless us with His presence and daily grace that enable us to finish the eight new cabins on the east side of the camp by the end of April 2020. On site, we had the visitation of the trustees who gave us sweet words of encouragement to keep going on with the project and shared on the importance and the meaning of Woodland Camp for the work in the whole of Europe. The work keeps heading toward the finalisation of the eight new cabins. As the majority of the work outside the cabins is almost complete, the focus in the remaining weeks will be mainly on the final details inside the cabins.

(Scroll through the slideshow below to see this month's progress) 

1 / 34
2 / 34
View of the cabins on the east side of the camp
3 / 34
The brothers installed the conduit for the data and the fibre optic cable to feed all the cabins and had them connected to the building controls at the central plant.
4 / 34
The conduit comes from the dog house located on the east side.
5 / 34
The cladding around the cabin and the porch was completed.
6 / 34
Every piece of wood is cut, smoothed down, and fitted.
7 / 34
The closet doors in the porch were made on-site and then installed.
8 / 34
Installation of the door on the porch
9 / 34
The HIU (Heat interface unit) is fully functional in all the cabins, and this will allow us to transfer the heat from the central plant into the cabins whenever it is required.
10 / 34
All the door frames were also made on-site.
11 / 34
Finishing the installation of all the outdoor lights
12 / 34
Each cabin will have the outdoor lights connected to PIR (passive infrared sensor). Upon approach, these will turn the lights on automatically.
13 / 34
Bags of sand were transported for the preparation and mixing with cement for the laying of the concrete base for the stairs on the cabins.
14 / 34
Brothers preparing the cement mix
15 / 34
The cement is poured into moulded wood boxes to create the base.
16 / 34
Smoothing out the concrete base
17 / 34
Once the concrete base is cured, the brothers proceed to install the stairs.
18 / 34
Each cabin will have a different set of stairs based on the height from the ground.
19 / 34
Installation of the railings and framing for the guard rails
20 / 34
Guard rails being installed
21 / 34
Installation and testing of the gutters
22 / 34
Tiling of the toilets and showers
23 / 34
Grouting, a mixture of water, cement, and sand, is applied for filling voids and sealing joints, such as those between tiles.
24 / 34
Installation of all the sanitary fixings, toilets, sinks, and towel rails
25 / 34
Caulking all corners of the shower
26 / 34
Applying the first coat of paint inside the cabins
27 / 34
Second coat of paint
28 / 34
Installation of the door locks
29 / 34
Cleaning and smoothing out the doors to be varnished
30 / 34
Installation of the wood flooring
31 / 34
Installation of the window sill
32 / 34
Fixing imperfections of the architraves with wood filler
33 / 34
On the site, we are in the process of cleaning up the east end of the camp.
34 / 34
Transporting drainage and sewage pipes as part of the clean-up of the site
#shadow-root(closed)
#shadow-root(closed)


HOW TO DONATE



Resources
Newsletter
Free Study Bible
Daily Radio Broadcast
Updates & News
Reports
Building Project
Woodland Camp
Donations
Contact Us

Amana Trust
Bower House
Orange Tree Hill
Romford, RM4 1PB

110 Pentonville Road
Islington
London, N1 9JB


+44 (0) 1708 380 301
[email protected]

All verses and footnotes taken from the Holy Bible Recovery Version. Anaheim: Living Stream Ministry, 2003.


Copyright © 2018-. All Rights Reserved. Amana Trust, Bower House, Orange Tree Hill, Romford, Essex, RM4 1PB. Email: [email protected]. Registered in England and Wales, company number: 4366897. A charitable company limited by guarantee, charity number: 1093401. VAT: GB711295848 | Privacy Policy

Powered by Configio a Momentive Software owned company